Audit Readiness Process2 min read

Audit Readiness Step 2: Test of Design

The Core Reality: A Test of Design asks whether each control, as designed, would meet its objective if it operated as described. Clear owners, frequencies and procedures matter here. Doing it before the auditor arrives means gaps are fixed on your timetable.
The audit readiness process, step by step · Step 2 of 4
  1. 1
  2. 2
  3. 3
  4. 4
Read the overview first →
Where Teams Get Stuck

Vague procedures and missing owners show up as findings, late and expensive.

How RAMP Handles It

RAMP runs a design review against each control and lists the gaps in plain English with the remediation steps and owners.

October 21, 2026Try the RAMP demo ↗
In-Depth Guide
The Situation

The team believes its controls are fine but has never checked the design.

Where Teams Get Stuck

Vague procedures and missing owners show up as findings, late and expensive.

How RAMP Handles It

RAMP runs a design review against each control and lists the gaps in plain English with the remediation steps and owners.

What reviewers look for

A defined owner, a stated frequency, a clear procedure and a named evidence source.

Fix before you test

Close design gaps before collecting operating evidence; evidence of a poorly designed control proves little.

Frequently asked questions

What is a Test of Design?
A check that a control, as designed, is suitable to meet its objective if it operates as described.
Leadership Action Item

Review design first. Next: preparing for Type 1.